Planned · Western
Bay St. George Long-Term Care Home (150 beds)
A 150-bed long-term care home at Stephenville Crossing — the site was expropriated in 2025, construction is still to be scheduled.
What’s being built
A 150-bed long-term care home is planned for Stephenville Crossing, and the province expropriated the site in September 2025. Pre-construction work has been funded through 2025 to 2027 but no construction value or start date has been published yet. At 150 beds this would be one of the larger institutional builds on the west coast when it goes to tender, carrying site work, concrete, framing, mechanical and finishing trades for two to three years.
Workforce
Site secured; construction value and start date not yet published.
Trades needed
- Heavy Equipment Operator
- Concrete Finisher
- Carpenter
- Sheet Metal Worker
- Construction Electrician
- Plumber
- Roofer
These are the trades the project is expected to need. Tap one to see open jobs in that trade anywhere in the province.
Key facts
- Proponent
- Government of NL / NL Health Services
- Stage
- Planned
- Value
- Not published
- Start
- Not announced
- Finish
- Not announced
- Region
- Western
- Sector
- Health care
Design, tendering or permitting under way.
Western
Open jobs on this project
Nothing posted here yet
No employer has posted a job on this project yet. Follow it and we'll tell you the day one lands.
Work on a project like this is usually posted a few weeks before it starts. Following it puts you at the front of the line.
Follow this projectWestern · Planned
Be on the list
before the call.
Workers: a profile takes about eight minutes and it is the whole application — no resume, no cover letter. Employers: attach your posting to this project so the right people find it.