Labrador West Transmission Line and Flora Lake Terminal Station

A 735 kV line from Churchill Falls to Labrador City with a new terminal station — engineering through 2026.

Newfoundland and Labrador Hydro$1B
All projects

What’s being built

A 735-kilovolt transmission line running from Churchill Falls to Labrador City, together with the new Flora Lake terminal station, backed by a federal commitment of about $1 billion. Front-end engineering is targeted to finish in December 2026 and no construction date has been set yet. It matters beyond its own crew count: it is the line that would unlock further mining development in the Labrador Trough, including Kami.

Workforce

Engineering completes December 2026. Construction start not yet set.

Trades needed

These are the trades the project is expected to need. Tap one to see open jobs in that trade anywhere in the province.

Key facts

Proponent
Newfoundland and Labrador Hydro
Stage
Planned
Value
$1B
Start
Not announced
Finish
Not announced
Region
Labrador
Sector
Energy

Design, tendering or permitting under way.

Loading the map

Labrador City · Labrador

Source: Newfoundland and Labrador Hydro

Open jobs on this project

Nothing posted here yet

No employer has posted a job on this project yet. Follow it and we'll tell you the day one lands.

Work on a project like this is usually posted a few weeks before it starts. Following it puts you at the front of the line.

Follow this project

Labrador City · Planned

Be on the list
before the call.

Workers: a profile takes about eight minutes and it is the whole application — no resume, no cover letter. Employers: attach your posting to this project so the right people find it.