West White Rose Extension
The concrete gravity structure and topsides at Argentia — about 85% done, with first oil expected in 2026.
What’s being built
Cenovus's West White Rose platform was built at the Argentia fabrication site and is now roughly 85 per cent complete, with platform testing finished and drilling under way. First oil is expected during 2026, though that date has slipped within the year, and peak production of about 80,000 barrels a day is forecast by the end of 2029. Around $2 billion of capital remains. Commissioning work favours pipefitters, welders, electricians and instrumentation hands.
Workforce
Argentia has been the province's busiest industrial yard through this build.
Trades needed
- Steamfitter / Pipefitter
- Welder
- Construction Electrician
- Industrial Mechanic (Millwright)
- Ironworker (Structural / Reinforcing)
- Mobile Crane Operator
- Insulator (Heat & Frost)
These are the trades the project is expected to need. Tap one to see open jobs in that trade anywhere in the province.
Key facts
- Proponent
- Cenovus Energy
- Stage
- Under construction
- Value
- $2B
- Start
- Not announced
- Finish
- December 2026
- Region
- Avalon Peninsula
- Sector
- Energy, Marine & ports
Crews are on site now.
Argentia · Avalon Peninsula
Open jobs on this project
Nothing posted here yet
No employer has posted a job on this project yet. Follow it and we'll tell you the day one lands.
Work on a project like this is usually posted a few weeks before it starts. Following it puts you at the front of the line.
Follow this projectArgentia · Under construction
Be on the list
before the call.
Workers: a profile takes about eight minutes and it is the whole application — no resume, no cover letter. Employers: attach your posting to this project so the right people find it.